Give Us A Call: (661) 726-5375

Lancaster, CA (2001-Present)

Pipeline Project

(2001-Present

  • Constructed 5 miles of 36” transmission main at a cost of $6,400,000.00
  • Constructed 4 additional miles of 36” transmission main at a cost of $6,000,000.00

(1995-1996)

  • Project size: 17 miles
  • Purchased an additional three 5 acre well sites and water storage facility
  • 1 mile of 36” water main designed and constructed
  • Scope of work included dealing with Cal-Trans because we had to go under State Route 14, Southern Pacic Railroad, and Lake Lancaster

(1990-1992)

  • 2 miles of 36” water main designed and constructed
  • Total cost of $2,000,000.00

(1990-1991)

  • Well project #58 and #59
  • Designed and constructed 1 500,000 gallon storage tank
  • Drilling and construction for 2 wells, pump house and 6 booster pumps at a total cost of $2,500,000.00

(1989-1990)

  • Well project #54 and #55 Designed and constructed 1 500,000 gallon storage tank

  • Drilling and construction for 2 wells, pump house and 6 booster pumps at a total cost of $2,500,000.00

(1987-1988)

  • Well project #42 and #43

  • Designed and constructed 1 500,000 gallon storage tank

  • Drilling and construction for 2 wells, pump house and 6 booster pumps at a total cost of $2,500,000.00

This project supplied water for 20,000 homes, as well as over 4,000,000 sq ft of commercial and industrial space. Total cost: $39,000,000.00