Lancaster, CA (2001-Present)
Pipeline Project
(2001-Present
- Constructed 5 miles of 36” transmission main at a cost of $6,400,000.00
- Constructed 4 additional miles of 36” transmission main at a cost of $6,000,000.00
(1995-1996)
- Project size: 17 miles
- Purchased an additional three 5 acre well sites and water storage facility
- 1 mile of 36” water main designed and constructed
- Scope of work included dealing with Cal-Trans because we had to go under State Route 14, Southern Pacic Railroad, and Lake Lancaster
(1990-1992)
- 2 miles of 36” water main designed and constructed
- Total cost of $2,000,000.00
(1990-1991)
- Well project #58 and #59
- Designed and constructed 1 500,000 gallon storage tank
- Drilling and construction for 2 wells, pump house and 6 booster pumps at a total cost of $2,500,000.00
(1989-1990)
-
Well project #54 and #55 Designed and constructed 1 500,000 gallon storage tank
-
Drilling and construction for 2 wells, pump house and 6 booster pumps at a total cost of $2,500,000.00
(1987-1988)
-
Well project #42 and #43
-
Designed and constructed 1 500,000 gallon storage tank
-
Drilling and construction for 2 wells, pump house and 6 booster pumps at a total cost of $2,500,000.00
This project supplied water for 20,000 homes, as well as over 4,000,000 sq ft of commercial and industrial space. Total cost: $39,000,000.00